Lead time calculator
Lead time: what it is and how to calculate it
Lead time is the number of days from sending a purchase order to having the stock where you can sell it. Paste the POs you've already received, and the calculator gives you the average, how much they vary and which was slowest, then turns that into a reorder point.
Your purchase orders
Paste from a spreadsheet or type them in. Dates as 2026-03-02 or 3/2/2026; a line with one number is read as a lead time you already know. Use the day the stock could be sold, not the day it was delivered. The sample is eight POs from one supplier.
Lead time
21 days on average
Over 8 POs, from 17 to 28 days.
- Median
- 20.5
- p80
- 22
- Slowest
- 28
- Spread (std dev)
- 3.08
Where the days go, on average
At the supplier 9.4 days Shipping and receiving 11.6 days
Every PO, against the average
The line marks the average. A PO slower than the p80 is in red.
Turn it into a reorder point
Don't know the daily std dev? Paste your daily sales into the reorder point calculator and it works it out. Enter 0 to plan on lead time alone.
| Lead time you plan with | Lead time | Safety stock | Reorder point |
|---|---|---|---|
| Average lead time, sales spread only | 21 d | 20 | 293 |
| Average lead time plus its spreaduses every PO | 21 d | 69 | 342 |
| p80 lead time, sales spread only | 22 d | 21 | 307 |
| Slowest lead time, no safety stock | 28 d | 0 | 364 |
- Lead-time demand = 13 × 21 days = 273
- Safety stock = 1.645 × √(21 × 2.65² + 13² × 3.08²) = 69 (rounded up)
- Reorder point = lead-time demand + safety stock = 342 units
Thirty days to Shenzhen
On July 7, 2026, I was going through a brand's purchasing setup in sku.io with them. They had written to me that there was a 30-day lead time to Shenzhen, and I took Shenzhen for the supplier. It wasn't. It was a forwarder's warehouse. The supplier was a different company in the same city, and the forwarder sent the stock on to the UK, Australia, the US and Canada. Two legs, and only the first one was the supplier's.
We were on the inbound shipment screen when I drew the other line, between stock arriving and stock you can sell. "ETA is when it like actually reaches like a 3PL," I said. "But that doesn't mean they're going to process it right away. So, you know, available is like when it's available for sale." With no date from the 3PL we would have to assume a handling time, two business days to receive, say. "But again that could vary."
Two weeks later they asked whether the forecast could plan each market on its own: about two months into the US, Canada and Australia, two and a half into the UK and the EU. A colleague of theirs did the sum out loud. Sixty days was thirty at the manufacturer and thirty on the water. We had one lead time per supplier then, which a product could override, and nothing per destination. "The supplier is going to have a lead time," I told them. "You're just trying to account for that. You know, two week extra lead time on the UK."
I had written the spec for it the night before, at half past eleven: a lead time per supplier, an override for each destination warehouse, and the measured lead time we already stored per product finally feeding the forecast. On the call I still said "I don't think it's ready yet really." It merged at 2:24 that afternoon. One decision in it was easy to get wrong. A lead time measured from your own receipts already runs from PO to shelf, so it replaces the configured total instead of having the shipping leg added on top, which would count the water twice. Today a supplier's lead time can be overridden for each warehouse it delivers to. The measured one still only works, as I said that day, "if you have a history." For a new supplier it is a guess for the first few POs, and the guess is nearly always the supplier's quote.
What lead time means
Lead time = the date the stock is sellable − the date the PO was sent, counted in calendar days, because you sell on weekends too.
The supplier's part runs from your PO reaching them to the goods leaving their dock, and if they make to order it is usually the biggest piece. It is also the only piece their quote covers. The trip is transit, the port, customs and a truck at the end, and it belongs to the route more than to the supplier: the same goods took two months to Canada and two and a half to the UK. Then receiving, which is yours. A carton on the dock for two days before anyone counts it is two more days of lead time.
Factories also say lead time for how long they take to make an order, and stores use it for how long a customer waits for a parcel. For buying stock it is the whole stretch, since that is how long you sell from what is already on the shelf.
How to calculate lead time from your POs
Take every PO you've received from one supplier into one warehouse in the last year. For each, subtract the date you sent it from the date the stock became sellable. If you have the ship date, subtract that too, so you can see which part moves. Then take the average, and look at the slowest.
The sample is eight POs, from 17 to 28 days. They average 21 days, the same lead time as the example in the reorder point template. The median is 20.5, the p80 is 22 (seven of the eight took 22 days or less) and the standard deviation is 3.08 days. The supplier part is steady at 8 to 10 days. The trip is where the variation comes from: 9 to 12 days, except PO-1080, the sample's customs hold, which took 18.
In a spreadsheet, put the sent date in column B and the sellable date in column D, then
=D2-B2 in column E for each PO. =AVERAGE(E2:E9) gives the average,
=STDEV.P(E2:E9) the spread, =PERCENTILE.INC(E2:E9,0.8) the p80 and
=MAX(E2:E9) the slowest. The calculator uses the same population standard deviation
and percentile, so it matches a sheet built that way.
The average lead time leaves out the late PO
A reorder point built on 21 days assumes every PO lands on day 21. At 13 units a day and a 95% service level, the service-level formula gives 20 units of safety stock and a reorder point of 293. That safety stock covers selling faster than usual. It does nothing for PO-1080.
The longer formula puts the lead time spread in as well: safety stock = z × √(lead time × daily std dev² + daily sales² × lead time std dev²). On the sample, that is 1.645 × √(21 × 2.65² + 13² × 3.08²) = 69 units, and the reorder point becomes 342. Planning on the p80 of 22 days with the plain formula gives 307. Padding the lead time to the slowest 28 days, with no safety stock at all, gives 364.
Don't delete PO-1080 as an outlier. A late PO is exactly what safety stock is for, and taking it out makes the spread look smaller than the supplier is. With six or more POs, use the longer formula, which takes every one of them into account. With two or three, there is not enough history to have a spread, so plan on the slowest one you have seen. For Amazon, sku.io measures each route into FBA from your own shipments and can plan with the p80 rather than the typical one.
Which part you can shorten
The supplier part can be negotiated, or cut by having the supplier hold finished stock for you. Shipping is a choice of route and mode, and a faster mode costs freight that the landed cost calculator spreads over each unit. Receiving is the one part entirely yours. Count stock the day after it lands and every lead time you measure is a day longer than it needs to be. Don't record receipts at all and there is nothing to measure; a recorded receipt is the thing I check before I call an onboarding done, for the reasons in Live Does Not Mean Anyone Is Using It.
For one supplier into one warehouse, the spreadsheet above is enough. Past that, every warehouse and FBA region has its own trip and every SKU its own sales, and the SKU demand forecast calculator covers the sales half from monthly history. In sku.io, the calculation details on a forecast row show which lead time it used, with a chip that says Policy, Supplier WH, Measured, Product, Supplier or Default.
Questions people ask
What is lead time?
Lead time is the number of days from sending a purchase order to having the stock where you can sell it: the supplier’s time, the trip, and your own receiving.
What is the lead time formula?
Lead time = the date the stock became sellable − the date the PO was sent. PO-1041 in the example was sent on January 5 and sellable on January 22, so its lead time is 17 days.
What is a p80 lead time?
The lead time that 80% of your POs came in at or under. Seven of the eight example POs took 22 days or less, so their p80 is 22 days, against an average of 21 and a slowest of 28.
Should lead time be in calendar days or business days?
Calendar days. You keep selling on weekends and holidays, and the reorder point multiplies lead time by sales per calendar day, so both have to count the same days.
Are my PO dates uploaded anywhere?
No. The math runs in your browser. There is no form and no upload, and the calculator is excluded from the site’s session recording.
Bring the supplier whose deliveries keep slipping
Bring a year of POs from that supplier. We'll work out its lead time per warehouse together and see what it does to the suggested orders in the sku.io forecast.