Skip to main content

Track packaging at your factories

When a contract manufacturer packs your product, they work through the pouches, cards, labels, and other components you sent them. The Packaging at factories tab shows how much of each one every contractor site still holds, whether that covers the outsourced orders still open there, and how much to send next. The Factory Packaging Running Short alert tells you, and the person you name for that factory, before production stops for lack of packaging.

You don't record any of this by hand. Packaging reaches a site when you receive a purchase order there or a warehouse transfer into it. It leaves the site when you receive finished goods on an outsourced manufacturing order, which consumes each component at the site per the recipe. See Manufacture with a contract manufacturer for that flow.

Before you begin​

  • You need the Manufacturing module and the Manufacturing → View permission (manufacturing.index).
  • The factory has to be an activated contractor, so it has a site warehouse. See Manufacture with a contract manufacturer.
  • The finished good needs a recipe that lists the packaging as components. Components the contractor supplies themselves are never counted here, because they aren't yours.

Steps​

  1. Go to Manufacturing → Contractors.
  2. Click the Packaging at factories tab. A number on the tab counts the components that need attention.
  3. Read the cards at the top: Contractor sites, Components tracked, Running short, and Units short for open orders.
  4. To see one factory, pick it in Site. To find a component, type its SKU or name in Search.
  5. To list only the components that need action, turn on Needs attention only.
  6. In a component's row, read its Status and Suggested send.
  7. To see which orders need a component, click the number under Open orders need. Each order links to its manufacturing order.
  8. To act on a shortfall, send the Suggested send quantity to the site on a purchase order or a warehouse transfer.

Each site has its own card, headed by the site warehouse and the contractor's name, with All covered or a count of components running short. Click the site name to open the warehouse, or a component's SKU to open the product. Reconciliation at the top opens the Factory Packaging Reconciliation report.

What each column means​

ColumnWhat it shows
ComponentThe component and its name.
StatusWhether this component needs action at this site. See the next table.
On handWhat SKU.io holds at the site now, in the component's stock unit.
Open orders needWhat the open outsourced manufacturing orders at this site still need, after what they've already consumed. It includes the recipe's expected scrap. Orders count while they're Draft, Confirmed, In Progress or Partially Completed.
CoverageOn hand minus Open orders need. A negative number means the factory runs out before it finishes those orders.
Reorder pointThe level that raises the alert. Blank until you set one.
Used (30 days)What received production consumed and scrapped at this site over the last 30 days.
Days of coverOn hand divided by the average daily use over the last 30 days. Blank when nothing was used.
Suggested sendHow much to send so the site covers its open orders and gets back to its order-up-to level. Without an order-up-to level, it's the amount that covers the open orders.

A warning icon beside Open orders need means a recipe line uses a unit this component has no conversion for, so its need is shown unconverted. Add the conversion on the product's Units tab.

Status takes the first of these that applies:

StatusMeans
Short for open ordersThe site holds less than its open orders still need. The row is shaded red.
Below reorder pointOn hand is at or below the reorder point for this component at this site.
Low coverAt the last 30 days' rate of use, it lasts fewer days than the contractor's minimum days of cover.
CoveredIt covers the open orders and is over its reorder point and minimum days of cover.

Set a reorder point for a site​

A reorder point here belongs to one component at one site, so the same pouch can have a different trigger at each factory.

  1. In the component's row, click the + beside Reorder point. When one is already set, the icon is a pencil.
  2. In Reorder Point, enter the level that should raise the alert.
  3. To have Suggested send top the site back up, enter a Reorder Up To Level.
  4. Click Create Policy, or Save Changes when you're editing an existing one.

This saves a planning policy for the component at that site warehouse, the same policy you'd see under item planning policies.

Choose who gets the alert for a factory​

  1. On the site's card, click Alert settings. Hover it first to see the current settings.
  2. In Also alert, pick the person who looks after this factory, or leave it on Nobody else.
  3. To alert on days of cover, enter Minimum days of cover, a whole number from 1 to 365. Leave it blank for no days-of-cover check.
  4. Click Save.

Alert settings is turned off for a site that has no contractor.

How the alert works​

Manufacturing: Factory Packaging Running Short checks every contractor site each hour. A site is alerted when any component there is Short for open orders, Below reorder point or Low cover.

  • Each site gets one alert, titled with the site and the count, such as "3 components running short". It lists each component with what the site holds and what's needed, and links back to this tab filtered to that site.
  • It goes to the people set for it in Alert Preferences. By default that's everyone with the Manufacturing → View permission, plus admins. The person named in Also alert gets it too, marked as sent directly to them.
  • It's raised again when the list of short components changes, or once a day while it stays the same.
  • It clears on its own once every component at the site is covered.
  • A deactivated contractor is never alerted on.

The alert is on by default with High priority. To turn it off, change its priority, or send it to Slack, find it in the Inventory group of Alert Preferences. The Alert preferences link in the Alert settings dialog opens that page. See Choose which alerts your team gets.

Next steps​

Last verified: